The Department of Transportation will continue the replacement of the Queensboro Bridge upper deck with nighttime, single lane closures in each direction as per the schedule below until Saturday, November 26th. These lane closures are restricted to the nighttime, however, there will be single-lane, rolling closures in the daytime to drop off material as required.
Queensboro Bridge Lane Closures Through November 26, 2025
Rat Academy Training, October 24 at 10 AM
Rat Academy 10.24 NYC Council Member Keith Powers

