The Department of Transportation will continue the replacement of the Queensboro Bridge upper deck with nighttime, single lane closures in each direction as per the schedule below until Saturday, November 15th. These lane closures are restricted to the nighttime, however, there will be single-lane, rolling closures in the daytime to drop off material as required. At off-peak times, parts of the bikeway may be reduced to a minimum of five feet for maintenance. Flaggers will be present at either end of the work zone to direct bicyclists. Bicyclists are advised to use caution.



